A trigger depth is the amount of new snow, written into a snow removal contract, at which the contractor starts plowing or clearing, for example 5 cm (2 in). Below it, the contract does not call for a visit; at or above it, the contractor comes out within the agreed response time.
It is the number that decides how many times you show up and bill in a winter, so it needs a unit, a place to measure it and a source both sides accept. This is general information, not legal advice.
Quick answer
- What it is: the snowfall depth that starts a plowing or clearing visit.
- What it sets: when you must respond, and when you can bill.
- What it needs: a unit (cm or inches), where it is measured, and what counts if you disagree.
- What it doesn’t cover: ice. De-icing needs its own trigger, because ice can form on nights with no snow.
- There is no standard number. It is whatever you and the client agree and write down.
How to choose the number
- Lower for busy surfaces. You can set a lower trigger for walks, entrances and ramps than for the parking lot, because people walk there first.
- “Any snow” is a trigger too. Some clients want service at any accumulation. Price it for the extra visits it brings.
- Match your capacity. A lower trigger means more visits in a light storm. Make sure your crews can reach every site that triggers at once.
- Price it in. Per-event prices and seasonal prices both depend on how many visits the trigger produces. The free pricing calculator asks for it.
Where and how it is measured
- Where: an undisturbed spot on the site, not a drift, a pile or a sheltered corner. Name it if the site is big.
- What counts: new snow since it started falling, or since your last visit, on the surface you service.
- How: a ruler or a marked stake, with a time-stamped photo of the reading when it matters.
- If you disagree: name a weather source in the contract, such as an Environment and Climate Change Canada or U.S. National Weather Service station near the site.
The trigger is measured snow, not forecast snow. You may choose to start before the trigger to keep a site ahead of a big storm; say in the contract whether that visit is billed.
De-icing needs its own trigger
Snow depth says nothing about ice. Freezing rain, refreeze after a thaw and a clear, cold night after a melt can all need salt with no snow to plow. Write a separate de-icing trigger, based on conditions such as ice, freezing rain or a pavement temperature you name, and treat each de-icing visit as its own event, with its own rate on a per-event contract.
A snowfall usually brings both: a plowing visit at the trigger, then a de-icing visit. They are two events. On a per-event contract that prices de-icing separately, each is its own line on the invoice; if your contract includes de-icing with the plowing visit, say so in writing, so the client is never billed twice for one storm.
Wording you can adapt
“Plowing starts when [5 cm / 2 in] of new snow has accumulated on the parking lot, measured at [location]. Walks and entrances are cleared at [2.5 cm / 1 in]. De-icing is a separate visit, started by [ice, freezing rain or refreeze]. Where depth is disputed, the [named weather station] record for the site’s area applies. Service begins within [response time] of the trigger.”
Pair it with a definition of when an event ends, so a storm with a lull is billed the same way every time. Per-event billing explained covers that sentence, and the contract clauses guide covers the rest of the contract. Have a local lawyer review the final wording.
Arguments a clear trigger prevents
- “You plowed a dusting and billed us for it.”
- “It snowed and nobody came.”
- “That was one storm, not two.”
- “The walks were icy but you only plowed.”
Setting your triggers in Icey Software
We make Icey Software. In Settings → How you work → Triggers & season, you set your snow trigger, in centimetres or inches to match your units, and your de-icing temperature trigger, along with your response time. Your quotes and contracts print what you enter there; leave a trigger blank and your documents make no promise about it.
Weather Center has a “Notify me” alert you can switch on for when the forecast crosses your snowfall trigger. Free forever up to 10 sites and 5 crew. Every feature.
Frequently Asked Questions
What is a typical snow trigger depth?
There is no standard. It is whatever the contract says, for example 5 cm (2 in) for a lot. You can set a lower trigger for walks and entrances than for the lot, and some clients ask for service at any snow. Pick a number your crews can deliver across every site, and price for the visits it brings.
Is the trigger measured or forecast?
Measured. The trigger is snow on the ground at the site, not what the forecast said. Name where it is measured and which weather station decides a disagreement.
Do I need a separate trigger for salting?
Yes. Ice can form without snow, so write a de-icing trigger based on conditions such as ice, freezing rain or refreeze, and treat each de-icing visit as its own event.
Can I plow before the trigger is reached?
You can, to stay ahead of a big storm or because the client asked. Say in the contract whether a visit below the trigger is billed, and note on the invoice why it happened.
Does a trigger depth matter on a seasonal contract?
Yes. Even when the price is fixed for the season, the trigger sets when you must show up and how often, which drives your cost.
Price a job with the free calculator
Related guides
Price your next contract in two minutes
Our free pricing calculator turns property type, size, and snowfall intensity into per-push and seasonal ranges — with the math shown, not hidden.
Open the free calculator